PSA L&P - Projects: How voids are reported on Project Reports

How voids are reported on Project Reports

Below is a project report before check 1057 was voided.

When Check 1057 is voided, the following voiding entry is created.  Notice the Project Name is added to the Journal Entry.

The Project Report reflects the void.